11.5 - Daily Reporting

The Daily Reporting section of Well Seeker allows the user to create daily reports for a given well. The Daily Reporting tool is only available for selection at the Actual Well level or below.

The user can access all features of the daily reporting module via the ribbon menu, or the main user interface itself.

Drilling & sliding activities cannot be edited in the Daily Activities grid. These activities are created automatically whenever the user saves their Slide Sheet. 24 hour & BHA run drilling parameters, drilling and circulating hours, etc. are all calculated from the slide sheet and stored in the background.

11.5.1 - Daily Report Main User Interface

The Daily Reports page is where the user records all the relevant information relating to the day’s activities. It is split into 5 different sections; Menu Ribbons; Report Selection; Daily Data; Mud Data and Daily Activity.

Figure 244: DDR Main User Interface

11.5.1.1 - DDR Menu Ribbons

Figure 245: DDR Menu / Ribbon

The menu ribbons section contains all the options and additional tools to complete a daily report. It is split into four ribbons – Home, DDR Options, EOWR Options and Settings. Follow these links to see their pages:

11.5.2 - Daily Report Home Ribbonchevron-right11.5.3 - DDR Options Ribbonchevron-right11.5.4 - EOWR Options Ribbonchevron-right11.5.5 - Settings Ribbonchevron-right

11.5.1.2 - DDR Report Selection

This section can be used to navigate through existing reports. The dropdown box on the left can be used to select the desired report from a list in chronological order. The calendar to the right is used to assign a date to the report. Only one report can be assigned to each date.

The user can also change the report number in the Report # field.

Figure 246: DDR Report Selection

11.5.1.3 - DDR Daily Data

This section can be used by the user to enter some additional summary data for the day, such as the 24 hour summary and the 24 hour lookahead. All fields can be edited by double left-clicking, except for Assembly Type and MWD Type, which are selected from dropdown menus. Data entered here will be available in reports and analytics.

Figure 247: DDR Daily Data

11.5.1.4 - DDR Mud Data

The DDR Mud data can be used to record drilling fluids information for the day. Data entered here will be available in reports and analytics.

Figure 248: DDR Fluids Section

11.5.1.5 - DDR Daily Activity

The Daily Activity grid is where the user can view and edit the directional driller’s activity record for the selected daily report. Days in Well Seeker X are always recorded from midnight to midnight. When the user enters data into a line, Well Seeker will create a new line so that the user can continue filling in the day, unless the previous line has an End Time of 24:00.

Note that activities with the activity codes 2K (Rotary Drilling) and 2J (Slide Drilling) cannot be edited in the Daily Activities grid. These activities are created automatically whenever the user saves their Slide Sheet. The slide, rotate and drilling parameter data in the slide sheet is used to construct these activities in the daily report. Any gaps in the rotary/slide drilling activity are filled with the default activity, which can be defined in the Settings ribbon. 24 hour & BHA run drilling parameters, drilling and circulating hours, etc. are all calculated from the slide sheet and stored in the background.

Figure 249: Daily Activity
  • Date: The date of the activity. This is set in the calendar in the report selection section.

  • Start Time: The start time of the activity. Only the time for the activity on the first line can be set manually. The start time for all other activities is set by the end time of the previous activity.

  • End Time: The end time of the activity.

  • Hours: The time duration between the start time and the end time of the activity. This is automatically calculated.

  • Start Depth: The start hole depth of the current activity.

  • End Depth: The end hole depth of the current activity. Note that end depth will only be available to select when a drilling activity is selected from the drop-down menu in the activity column.

  • CL: The course length of the current drilling activity. If the user input a value here, the end depth will change automatically, if the user inputs a value in the end depth > start depth, the CL will change automatically.

  • BHA: The BHA run the activity is associated with. Any BHA entered in the Drill String editor will be available to select here from the drop-down menu.

  • Phase: The phase code and description that the activity falls under. The user can select the relevant Phase code from the drop-down menu. This information is used in the creation of the KPI tracking graphs and the Depth v Time Chart. For more information on Phase Codes see Phase Codes.

  • Activity: The activity code description that the rig site operations fall under. This information is used in the calculation of ROP, Slide Drill Run, Rotary Drill Run, Slide Hours Run, Rotary Hours Run and Circulating Hours Run, when Get Slide Rotate Hours from Activity is selected. Activity is also used in the creation of the KPI tracking graphs. For more information on Activity Codes see Activity Codes.

  • Description: The user should input a description of the activity and any other operationally pertinent events occurring between the start and end time, which will then be included in the daily report.