11.5.3 - DDR Options Ribbon

The DDR Options ribbon allows the user to choose what data is included in the daily reports.

Figure 263: DDR Report Options Menu

11.5.3.1 - Options

Allows the user to select whether to include the following data in body of the Daily Report. Toggling these options on/off will add/remove the relevant items from the daily report when it is printed using the Print Report button. If there is no data available, the section will not be included regardless of whether the section is toggled on/off:

  • BHA: Includes the most recently used BHA for that day. Data for the BHA is taken from the Drill String Editor (Drill String Editor).

  • Surveys: The daily report will check the depths in the Daily Activity section against the surveys in the actual wellbore for the well. Any surveys that fall within that day’s drilling will be included in a table.

  • Parameters: Includes data from the Drilling Parameters section in the DDR main user interface.

  • Pumps: Adds data from the Pump Data dialog.

  • Costs: Adds data from the Daily Costs dialog.

  • MWD Data: MWD Data is taken from the MWD Parameters dialog and the Drill String Editor (Drill String Editor), specifically the component details of the MWD/LWD component.

  • Sign Off: Adds a section at the bottom of the report where the creators and approvers of the report can put their signature.

  • Activity description: Toggling this on will cause the Code column in the Daily Activity section to show the full description of the activity code, as opposed to just the activity code.

11.5.3.2 - Additional Reports

This submenu allows the user to add other reports from the Reporting module to the DDR when it is printed using the Print DDR buttons in the Home ribbon.

  • BHA: When selected, an additional tab will be included in the generated DDR which includes the BHA.

  • Slide Sheet: When selected, an additional tab will be included in the generated DDR which includes the Slide Sheet.

  • RVDS: When selected, an additional tab will be included in the generated DDR which includes RVDS report.

  • Survey: When selected, an additional tab will be included in the generated DDR which includes the Survey Report.

  • Inventory: When selected, an additional tab will be included in the generated DDR which includes the Inventory.

  • Costs: When selected, an additional tab will be included in the generated DDR which includes the Daily Costs.

  • Summary: When selected, an additional tab will be included in the generated DDR which includes the Summary report.

  • Well Statistics: When selected, an additional tab will be included in the generated DDR which includes the Well Statistics.

  • Tool Tracking: When selected, an additional tab will be included in the generated DDR which includes the Tool Tracking report.

  • Depth V Days: When selected, an additional tab will be included in the generated DDR which includes the Depth V Days chart.

Last updated

Was this helpful?