# 13.3 - Phase Codes

This option can be accessed via the database navigator menu or directly from the Daily Reporting dialog. Note that when accessing via the database navigator menu, the Phase Codes option will **only** be available to select from **Operator Level**.

These phase codes are used in the Daily Activities section of the Daily Reporting package and utilised for KPI Tracking Graphs and the Depth v Time Chart. Phases can be created and edited here.

![Figure 216: Well Phases Dialog](/files/REYkYKA4ktvC0LMZY8UW)

The **Save** button will save any changes made to the Phase Codes table.

The **Set to Default** button will set the phase codes to match the values entered in the Code Defaults (See **section 6.4.14 –Code Defaults**). If no defaults have been set, this button will reset the phase codes to the Well Seeker factory default.

If the associated Operator Properties have been locked, the Phase Codes will also be locked. Clicking on the **Lock** button will unlock them. If a password has been set in the associated Operator Properties, it will need to be entered before the window can be unlocked.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.innova-drilling.com/introduction/legacy-documentation/manuals/well-seeker-pro-1/13.0-reporting/13.3-phase-codes.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
